Construction of Airside and Perimeter Fence to secure the airport with a chain linked fence.
-
Constructing a 2.5 km runway to Bitumen Standards
-
Constructing and Equipping Domestic Modern Terminal with a passenger through put of 160 Pax capable of processing B737 -300 at once.
-
Construction of a Retail Concourse area.
-
An apron with 6no. Stands
-
A perpendicular connection taxiway
-
Installation of a temporary Air Traffic Control Tower
-
Construction of a Vehicular Parking for 100 Cars
-
Construction of Airport Access Road
-
Sinking of a Borehole and installation of elevated water tank
-
Installation of a Thermal Power Station to suit the Airport needs